( a ) Load factor differences 2. A thermal plant is operated initially at a high plant load factor and , over the years , it is operated at gradually reducing load factors , in accordance with its place in the order of economic merit ...
( a ) Load factor differences 2. A thermal plant is operated initially at a high plant load factor and , over the years , it is operated at gradually reducing load factors , in accordance with its place in the order of economic merit ...
Seite 106
Further , although the number of balancing units per kilowatt over the life of an alternative thermal station corresponds to the difference between the hydro plant load factor and the average plant load factor on a thermal system ...
Further , although the number of balancing units per kilowatt over the life of an alternative thermal station corresponds to the difference between the hydro plant load factor and the average plant load factor on a thermal system ...
Seite 108
Units per kilowatt at 41 % load factor ( 0-41 × 8760 ) Fuel Cost - Oil at 18,300 B.T.U./lb . , including handling Equivalent to standard coal at • Dundee - Transmission to Nevis delivery points Route miles to Fort William Route miles to ...
Units per kilowatt at 41 % load factor ( 0-41 × 8760 ) Fuel Cost - Oil at 18,300 B.T.U./lb . , including handling Equivalent to standard coal at • Dundee - Transmission to Nevis delivery points Route miles to Fort William Route miles to ...
Was andere dazu sagen - Rezension schreiben
Es wurden keine Rezensionen gefunden.
Inhalt
Annual Report and Accounts including the Report of the Electricity | i |
CONSTITUTION OF THE BOARD AND ADVISORY COMMITTEES | 4 |
TRANSMISSION | 9 |
55 weitere Abschnitte werden nicht angezeigt.
Andere Ausgaben - Alle anzeigen
Häufige Begriffe und Wortgruppen
accidents addition amount annual APPENDIX assistance Association Authority average Board boats brigades building capacity capital carried catch caused cent changes charges close coast Committee compared completed connection considerable construction consumers continued cost Council course December demand distribution District drift-net effect electricity engineering estimated examination experiments explosion Factories Fatal figures fire fishery fishing further given grounds heading hydro important improvement increase industry installation interest kilowatts landings lead less limited load March methods million nets North obtained Officer operation particular period persons plant ports possible present production received recorded Regulations Report Research river safety salmon schemes Scotland Scottish season showed South stations stocks supply TABLE taken thermal Total unit vessels