... and ( 2 ) for all the hydro installations on the system to be so designed that they
fit into a pattern whereby each will be ... installation and the average plant load
factor of thermal installations throughout their lives on the all - thermal system ...
... and ( 2 ) for all the hydro installations on the system to be so designed that they
fit into a pattern whereby each will be ... installation and the average plant load
factor of thermal installations throughout their lives on the all - thermal system ...
Seite 105
If it is proposed to introduce a hydro installation into this thermal system , it is
necessary to assess the relative economic merits of that hydro installation and
any alternative thermal station at this average plant load factor of 91 per cent . of
the ...
If it is proposed to introduce a hydro installation into this thermal system , it is
necessary to assess the relative economic merits of that hydro installation and
any alternative thermal station at this average plant load factor of 91 per cent . of
the ...
Seite 6
Gas Turbine Installation at Dunfermline 22. In view of the rapid increase in
demand it was considered advisable to augment the generating capacity ,
particularly for the years 1964 and 1965 , by installing a 70,000 kilowatt gas
turbine driven ...
Gas Turbine Installation at Dunfermline 22. In view of the rapid increase in
demand it was considered advisable to augment the generating capacity ,
particularly for the years 1964 and 1965 , by installing a 70,000 kilowatt gas
turbine driven ...
Was andere dazu sagen - Rezension schreiben
Es wurden keine Rezensionen gefunden.
Inhalt
Annual Report and Accounts including the Report of the Electricity | i |
Revenue Account 36 | 36 |
Annual Report and Accounts for the year ended 31st December 1962 | i |
17 weitere Abschnitte werden nicht angezeigt.
Andere Ausgaben - Alle anzeigen
Häufige Begriffe und Wortgruppen
accidents additional amount annual APPENDIX Association authorities average Board building cable capacity capital carried caused cent charges coal Committee compared completed connected considered construction consumers continued cost Council demand distribution District economic effect electricity energy engineering equipment estimated examined explosion face Factories falls Fatal figures fire firedamp firms fuel further gate given heading hydro hydro-electric ignition important increase industry injury Inspectors installation interest kilowatts lead less load factor machine machinery manufacture maximum means methods million North occurred Office operation organisation output period persons placed plant possible practice premises present problems processes production received Regulations Report result Road safety schemes Scotland Scottish shows South station supply taken tank Tariff thermal transmission units