During the year , load reduction by disconnections of supplies was necessary on 23 occasions . No such disconnections had been necessary in 1961–2 . Load reduction by voltage reduction took place on 38 occasions compared with 5 ...
During the year , load reduction by disconnections of supplies was necessary on 23 occasions . No such disconnections had been necessary in 1961–2 . Load reduction by voltage reduction took place on 38 occasions compared with 5 ...
Seite 15
Load Factor 40. In view of the immense investment that is now called for it is proper that most careful consideration should be given to the question of the economic use of plant . System load factor is the ratio , expressed as a ...
Load Factor 40. In view of the immense investment that is now called for it is proper that most careful consideration should be given to the question of the economic use of plant . System load factor is the ratio , expressed as a ...
Seite 30
100.0 100.0 100.0 + 8.3 + 3.6 + 2 : 7 System Load Factor 90. Based on the maximum demand actually met , the system load factor for 1962-63 was 49.7 per cent .; based on the maximum potential demand it was 45.7 per cent . 91.
100.0 100.0 100.0 + 8.3 + 3.6 + 2 : 7 System Load Factor 90. Based on the maximum demand actually met , the system load factor for 1962-63 was 49.7 per cent .; based on the maximum potential demand it was 45.7 per cent . 91.
Was andere dazu sagen - Rezension schreiben
Es wurden keine Rezensionen gefunden.
Inhalt
104 | 59 |
foot of each Report and the Figures at the end of the line refer to the Paging of | 63 |
106 | 69 |
25 weitere Abschnitte werden nicht angezeigt.
Andere Ausgaben - Alle anzeigen
Häufige Begriffe und Wortgruppen
31 March addition amount Appendix appointed approved Area Area Boards arrangements Authorities average awarded Balance Board bodies capacity capital cent Central centres Certificate changes charges coal colleges Committee completed consider consideration construction consumers continued cost Council courses demand Department detailed Education Education Authorities effect Electricity engineering equipment estimates existing expenditure financing fuel functions further given governing higher increase industry installed institutions interest lines load March matters maximum million Minister normal North nuclear officers operation output paragraph period planned plant power stations present profession professional programmes proposed pupils received recommend Region Regulations relation Report result scheme schools Scotland Scottish secondary Secretary South staff standards steam supply Table teachers teaching technical transmission turbine Type units universities Wales