Annual Report of the Association of Ontario Land Surveyors, Band 19 |
Im Buch
Ergebnisse 1-3 von 51
Seite 33
I think in making the original surveys if the shore lines were traversed and posted and made definite once for all , it would be much better ... Mr. Routly - I would make a number of courses and this original survey would always hold .
I think in making the original surveys if the shore lines were traversed and posted and made definite once for all , it would be much better ... Mr. Routly - I would make a number of courses and this original survey would always hold .
Seite 71
The most urgent work in this connection would be a topographic survey of the streams and immediate surrounding country to determine sites for storage basins or reservoirs where the water could be held back until needed during periods of ...
The most urgent work in this connection would be a topographic survey of the streams and immediate surrounding country to determine sites for storage basins or reservoirs where the water could be held back until needed during periods of ...
Seite 83
Instructions for this survey were dated March 19th , 1910 , and the survey was temporarily commenced a few days later . It was the intention of the Surveys Branch to have base lines for triangulation measured on the ice in preparation ...
Instructions for this survey were dated March 19th , 1910 , and the survey was temporarily commenced a few days later . It was the intention of the Surveys Branch to have base lines for triangulation measured on the ice in preparation ...
Was andere dazu sagen - Rezension schreiben
Es wurden keine Rezensionen gefunden.
Inhalt
Presidents Address | 7 |
Papers | 83 |
Future Prospects for Ontario Land Surveyors in the Mining | 98 |
6 weitere Abschnitte werden nicht angezeigt.
Andere Ausgaben - Alle anzeigen
Häufige Begriffe und Wortgruppen
adopted amount angle applied April Association better Board boundary Buildings calendar called Canada carried Chairman City Committee concrete construction cost Council course Court DATE determined divide Drainage east Engineer equal February fees field forest George give given Government Grad ground Henry high water mark important interest James John Judge July known Lake Land Surveyors length Limited March mark material matter means meeting method mining months motion move NAME Ontario original Ottawa pass period present President printed Province quarters Quebec question railway reference result road seconded side stone survey taken thing Thomas timber tion Toronto town township United Empire Loyalists whole Winnipeg