A.D. 1927. (Water &c.) Order Confirmation. (2) An embankment (Work No. 2) four hundred (3) A catchwater (Work No. 3) commencing at a (4) A road of access (Work No. 4) commencing at (5) A conduit or line of pipes (Work No. 5) 25 (6) A conduit or line of pipes (Work No. 6) In the parishes of Straiton and Dalmellington— 40 5 10 15 20 25 30 35 40 (Water &c.) Order Confirmation. point one hundred and fifty yards or thereby A.D. 1927. In the parishes of Dalmellington and Dalrymple— In the parish of Dalmellington (9) A break pressure tank (Work No. 9) situate (10) A battery of filters (Work No. 10) situate 2300 Ordnance map of the parish of (11) A clear water tank (Work No. 11) situate A.D. 1927. works. (Water &c.) Order Confirmation. 7. In addition to the foregoing works the Corporation may upon the lands delineated on the deposited Subsidiary plans and described in the deposited book of reference make maintain and use all such buildings machinery works and apparatus of whatever character as may be 5 necessary or convenient in connection with or subsidiary to the before-mentioned works or any or either of them but nothing in this section shall exonerate the Corporation from any action or other proceeding for nuisance in the event of any nuisance being caused or permitted 10 by them. Limits of deviation. Power to 8. In the construction of the works by this Order authorised the Corporation may deviate laterally to any extent not exceeding the limits of lateral deviation shown on the deposited plans and where on any road 15 no such limits are shown the boundaries of such road shall be deemed to be such limits and they may also deviate vertically from the levels shown on the deposited sections to any extent not exceeding in the case of the reservoir (Work No. 1) three feet upwards and five feet 20 downwards in the case of the embankment (Work No. 2) three feet upwards and to any extent downwards and in the case of other works five feet upwards and to any extent downwards Provided as follows (that is to say) : The Corporation shall not construct the embankment (Work No. 2) of a greater height above the general surface of the ground than that shown on the deposited sections in respect thereof and three feet in addition; Except for the purpose of crossing a stream or railway no part of any pipe shall be raised above the surface of the ground unless and except so far as shown on the deposited sections. 25 30 9. Subject to the provisions of this Order the Cor- 35 take waters. poration may collect impound take use divert and appropriate for the purposes of the water undertaking the waters of Loch Recawr Loch Slochy and Loch Goosie and all streams and tributaries the waters of which drain or flow into the said lochs and all such 40 springs streams and waters as may be intercepted by the works by this Order authorised. (Water &c.) Order Confirmation. 10. (1) Until the date of completion of the reservoir A.D. 1927. (Work No. 1) the Corporation may take from the stream known as the Whitespout Lane at a point not more than Compensatwo hundred yards below the embankment (Work No. 2) 5 any water they may require subject to the following restrictions : 10 15 20 25 30 35 40 (a) They shall place a gauge weir across the said stream at or near the proposed intake through an aperture in which six hundred and fiftyseven thousand gallons of water shall be allowed to pass every day of twenty-four hours: (b) On any such day during such time as the flow of water in the said stream shall be less than at the rate of six hundred and fifty-seven thousand gallons per day of twenty-four hours the Corporation shall not be entitled to draw any water therefrom but during such time as the flow is in excess of such rate the Corporation may take all or such part of the excess as they may require up to but not exceeding one million gallons in any day of twenty-four hours. (2) After the completion of the reservoir (Work No. 1) and the embankment (Work No. 2) the following provisions shall apply i (a) The Corporation shall during every day of (b) For the purpose of measuring the quantity of tion water. A.D. 1927. (Water &c.) Order Confirmation. (c) In lieu of discharging or allowing to flow down (3) In case of any neglect on the part of the Corpora- 20 (4) If any difference arises between the Corporation 30 and any persons so interested with respect to the construction or use of any gauge or the state of repair or condition thereof such difference shall be referred to the arbitration of an engineer to be nominated (unless otherwise agreed) on the application of either of them by 35 the sheriff. (5) The provisions of this section shall be accepted and taken by all persons interested as full compensation for all the waters of Lochs Recawr Slochy and Goosie and the streams and tributaries flowing into the said 40 Lochs which the Corporation can divert collect impound or appropriate by means of the works by this Order authorised except in respect of any lands situate between |