... bridge , be it of wood or iron , is very carefully designed , the stone arch is simply built so that it has positively abundant strength , existing structures generally being taken as guides , and but little attempt being made to look ...
... bridge , be it of wood or iron , is very carefully designed , the stone arch is simply built so that it has positively abundant strength , existing structures generally being taken as guides , and but little attempt being made to look ...
Seite 18
... bridge . The draw was a through span , and the approaches were deck spans , all riveted construction . The draw span rested upon a group of fifteen cast - iron piles , arranged in a circle as shown in the plan , Fig . 1 , and driven in ...
... bridge . The draw was a through span , and the approaches were deck spans , all riveted construction . The draw span rested upon a group of fifteen cast - iron piles , arranged in a circle as shown in the plan , Fig . 1 , and driven in ...
Seite 19
... bridge , showed that the contraction of the cross - section by the extension of bulkheads into the stream , by clumps of fender piles above and below each iron pier , and by the pivot - pier itself , had caused a scouring of the bed ...
... bridge , showed that the contraction of the cross - section by the extension of bulkheads into the stream , by clumps of fender piles above and below each iron pier , and by the pivot - pier itself , had caused a scouring of the bed ...
Seite 21
... bridge , to give notice of any approaching traffic , and the draw was swung around over each pile , or closed on signal . By 7.35 the next morning the fourteen piles were all driven , and the con- tractor was paid by the day - or rather ...
... bridge , to give notice of any approaching traffic , and the draw was swung around over each pile , or closed on signal . By 7.35 the next morning the fourteen piles were all driven , and the con- tractor was paid by the day - or rather ...
Seite 35
... bridge leading over the railroad embankment , had been set up in this depression and started just before orders had been received to stop the work , and a small quantity of material had been moved . It was fortunate that the amount was ...
... bridge leading over the railroad embankment , had been set up in this depression and started just before orders had been received to stop the work , and a small quantity of material had been moved . It was fortunate that the amount was ...
Andere Ausgaben - Alle anzeigen
Häufige Begriffe und Wortgruppen
Active Member Andrew's Bay angle angle-bars Annual Report arch average Board bolts bottom bridge cable canal cars cent Civil Engineers Club coal Coast Committee construction cost cubic yards curve David Townsend depth discharge distance dredging electric elevated feet flanges gauge grade H. W. Spangler Henry G Howard Murphy inches increased iron Joseph's Bay Kew Bridge length light load locomotives matter Messrs method miles motor Mount Penn nozzle operation paper passengers passing pavement Philadelphia piles pipe placed plate pounds pressure pump rail ends rail joints railroad railway rainfall Regular Meeting River rivets road Rudolph Hering Salom sand Santa Rosa Sound Secretary presented shaft side splice splice joint square square miles standard candle station steam steel stone streets subgrade surface Survey tests tion track trains Trautwine tube velocity vertical weight width York